as

fracticable, with a

view

to commencing the construction of the Summer Shrough the brownadonin laying between the profaced Peceron's, and the Staffy Valley. He this portion Happy of the work will if executes chinese labour, require from

tive te three

years

by

to complete,

it is therefore very desirable that this portion of the

work should be commencês

the frich

The Drawings to

have been prepared and

the works can be set on

Apistant Engineer applied for arrives from England.

(signed) 2. Fowler,

Acting Surveyor General.

fat April, 1882.

hand as

sam

as

the